Thanks a lot Al that was a good explanation, but 12 coats? Really? When I worked in a sheet metal factory the iridite line was lower, lift, slop repeat and dry.
Hmm, my patience isn't at an all time high right now (by a long way) so maybe I'll wait. Still, I appreciate the explanation.
Red.